Industrial - Queensland
PARK RIDGE: PLANNING FOR THE NEXT PHASE OF INDUSTRIAL GROWTH
With an indicative warehouse footprint of 8,310 m², Lot 1 at 103 Hubner Road reflects the changing demands of south- east Queensland’s industrial and logistics sector.
development as residential growth places additional demands on the regional road network. Logan City Council is progressing detailed design for the proposed Innovation Way extension between Green Road and Park Ridge Road. The project includes a signalised intersection and is intended to improve heavy vehicle access to and from Crestmead Industrial Estate. Further south, Queensland's Department of Transport and Main Roads is preserving the corridor for the proposed Park Ridge Connector. Planned as a motorway-standard link, it is intended to improve connections between southern Logan and the Logan and Gateway motorways, including routes serving industrial traffic travelling towards the Port of Brisbane. The connector remains a longer-term proposal, rather than an existing transport connection. However, its planning reflects the infrastructure requirements associated with expanding residential and industrial communities across Park Ridge, Flagstone and Yarrabilba. DEVELOPMENT OPPORTUNITIES The scale of Lot 1 provides scope for different industrial development approaches, depending on the requirements of the eventual owner or occupier. An owner-occupier could configure the facility around its operational needs. A transport business may prioritise vehicle circulation, trailer staging and loading infrastructure, while a manufacturer may require space for production, incoming materials, storage and dispatch. For developers and investors, the site also presents the potential for a build- to-lease project. A pre-lease arrangement could allow an incoming tenant to influence specifications such as clearance heights, power capacity, loading facilities and office accommodation. Alternatively, a more broadly configured warehouse could cater to a wider range of industrial occupiers. The preferred approach would ultimately depend on tenant demand, construction costs and development feasibility. PARK RIDGE'S EVOLVING INDUSTRIAL ROLE Lot 1 at 103 Hubner Road is being developed as southern Logan continues to attract industrial investment alongside significant population growth. Its position adjoining Crestmead Logistics Park, proximity to established freight routes and substantial usable land area reflect the characteristics increasingly sought in industrial development sites. As civil works progress and regional infrastructure planning continues, the property provides a snapshot of the opportunities and considerations shaping Logan's evolving industrial landscape. For further information, indicative warehouse plans or inspection arrangements, contact Jack Allwood at Allwood Property Group on 0410 302 343.
Modern industrial operations require more than warehouse space. Heavy vehicle access, loading facilities, storage, staff parking and connections to major freight routes all influence how effectively a site can function. As industrial activity expands across Logan, appropriately sized development sites are becoming an important part of the region’s industrial landscape. Lot 1 comprises a 14,611 m² allotment, including approximately 13,851 m² of usable land, adjoining the established Crestmead Logistics Park. PREPARING THE SITE FOR DEVELOPMENT Civil construction is underway, with completion targeted for the end of 2026 and titles anticipated in early 2027. The development is planned to deliver a benched, retained and flood-free industrial allotment with water, sewer and power services. The site's Medium Impact Industry zoning supports a range of uses, including transport, logistics, warehousing and compatible manufacturing, subject to relevant approvals. An indicative development concept identifies potential for a warehouse of approximately 8,310 m², representing around 60 per cent of the usable land area. The balance would accommodate loading, truck manoeuvring, parking and external hardstand. Final building dimensions and configuration will depend on detailed design and approvals. An early 2027 construction commencement is targeted, subject to civil works, title registration and the necessary approvals. The advertised provision for 24-hour B-double access is also relevant to operators managing freight and fleet movements outside conventional business hours. AN ESTABLISHED INDUSTRIAL SETTING Park Ridge and neighbouring Crestmead form part of Logan's broader industrial and employment landscape, supported by access to major arterial roads and an established network of industrial businesses. According to Allwood Property Group, Lot 1 is approximately 6 km from the Logan Motorway, 6.5 km from the Gateway Motorway and 3.8 km from the Mount Lindesay Highway. These connections support freight movements between Logan, Brisbane and the wider south-east Queensland network. The adjoining Crestmead Logistics Park provides an indication of the area's industrial activity. The Logan Office of Economic Development identifies Bunnings, Visy, Phoenix Transport and Nick Scali among the estate's key occupiers. It has also reported Mapletree's acquisition of an additional 18.6 hectares for expansion within the estate. The presence of businesses across retail distribution, packaging, transport and logistics reflects the diversity of activity already established in the precinct. INFRASTRUCTURE AND THE CHANGING ROAD NETWORK Transport infrastructure will continue to influence Logan's industrial
48 – November / December 2026
Powered by FlippingBook